Segment 3 Grade & Drain Work Package
Segment 3 is a four (4) lane bypass (new roadway) approximately 2.1 miles in length east of Dixon Mills. The bypass includes four bridges, multiple drainage structures, and mass excavation and grading. This work package is for clearing, grading, and drainage construction.
Bids Due: July 23, 2025, at 12:00PM CST
Pre-Qualified Bidders: